Calibration of the pH analyzer usually concerns itself with the calibration of the probe as the electronics of the transmitter are inherently stable.

Before calibrating the probe it is critical that the probe is clean and in good condition with the proper buffer solution (see troubleshooting and maintenance section).

pH Analyzer 


Observe these practices when calibrating the pH analyzer:

  • Always rinse the probe with distilled water between calibration points.
  • Never “wipe” the probe to remove excess fluid.
  • Always ensure that the buffer solution inside the probe is a minimum 2/3 full.
  • Keep the probe in a vertical position whenever possible.
There are two main calibration techniques:
  1. One-Point Calibration
  2. Two Point calibration
One-Point Calibration
  • Ensure the temperature setting on the meter corresponds to the temperature of the buffer solutions.
  • Ensure the probe is clean and rinse it with distilled water.
  • Place the probe in a buffer solution of 7.00 pH.
  • Adjust the zero (or equivalent) setting so the device reads 7.00.
  • Rinse the probe with distilled water and return to service.
Two-Point Calibration
  • Ensure the temperature setting on the meter corresponds to the temperature of the buffer solutions.
  • Ensure the probe is clean and rinse it with distilled water.
  • Place the probe in a buffer solution of 7.00 pH.
  • Adjust the zero (or equivalent) setting so the device reads 7.00.
  • Place the probe in buffer solution 4.00 pH or 10.00 pH (depending on whether the process fluid is an acid or base.)
  • Adjust the gain (or equivalent) setting for 4.00 or 10.00 pH.
  • Rinse the probe with distilled water and return to service.
Troubleshooting the pH Analyzer
90% of all problems with a pH measuring system are problems with the probe itself.

If there is no output signal or a maximum output signal from the transmitter, check the:

  • Loop continuity.
  • Loop power supply.
  • The transmitter itself and follow the manufacturer’s electronic troubleshooting guide.

Cleaning and checking the probe at regular intervals (dependent on the process) is important. Depending on process conditions, the probe should be checked at regular intervals for proper levels of buffer solution.

The light coating of the probe can be cleaned by rinsing with a water jet or placing the probe under a faucet of running water, always rinse with distilled water.

Heavier coatings may require a rinse or brush with a mild acid or detergent solution. It may be necessary to soak the probe for a period of time to loosen the coating. Always rinse with distilled water.

Major coatings may require brushing or soak with a 2%-10% hydrochloric acid (HCl) solution. Always rinse with distilled water. Check for proper temperature compensation.

If the reading does not match what the pH value of the process is:

  • Clean the probe as per the preceding procedure.
  • The reference electrode buffer solution may be contaminated, clean the probe, replace the solution, and calibrate the system.
  • The buffer solution in the measurement or reference electrode may be depleted, fill to the required level.
  • The silver/silver chloride wire of the measurement probe may have been chemically attacked by the process fluid, change the probe.
  • Natural aging of the measurement electrode (they have a finite life span), change the probe.

Troubleshooting Guide:

Most manufacturers approved a troubleshooting guide, follow the guide to determine the cause and solution, a typical guide is shown below.



Comments

Popular posts from this blog

What is a Torbar? – Averaging Pitot Tubes

 The Torbar is employed for flow measurement of liquids, gases, or steam in circular, square, or rectangular section ducts for large flow rates. The Torbar is an insertion type multi-port self-averaging primary sensor for flow measurement. Torbar TORBAR is a set of Pitot tubes mounted on a bar across the pipeline with no moving parts. An averaging Pitot tube is a technology, while TORBAR is a manufacturing brand name. There are several brands available in the market with VERABAR, ANNUBAR, etc. Averaging Pitot Tube Principle Purpose Averaging Pitot tube can be employed when the average velocity of the flow profile, rather than the velocity in a specific point in the cross-section is desired. Averaging Pitot Tubes Principle It measures the differential pressure between the static pressure tap and the tap of full pressure of a stream. Thus such magnitude of differential pressure is directly proportional to the square of the flow rate. Working The TORBAR is designed in such a way that ...

Ferrules and Cross Ferruling

 Ferrules are identification labels provided for every wire terminations in an instrument, equipment, or electrical/instrumentation control panels. These tube-shaped sleeves can be inserted easily on each individual wire in a multi-core cable. In earlier days fixed digits/letters are used as ferrules, but now Instrumentation engineers/technicians prints out desired ferrules by using a ferrule printing machine. Typical Ferrule The numbers/ letters on the ferrules will be given as per the approved electrical hook up or loop diagrams. This helps technicians to easily identify a particular loop/wiring from a series of terminal blocks and to troubleshoot the desired terminal connection. Separate numbers on the ferrules distinguish the positive and negative polarities of wires, thus ensure the polarity protection of the instrument. Cross Ferruling  As a wire is connected on its both ends, it is quite useful to use a cross reference method for wire identification. Unlike normal ferru...

Thermowell Insertion and Immersion Length

 The thermowell is the industrial housing for temperature elements like RTD or thermocouple or temperature gauges. Thermowell is directly exposed to process fluid/media. Inside the thermowell, element/gauge is installed. Thermowell transfers the heat to the temperature element. Depending upon the element type, the fluid temperature can be known. So Thermowell protects the temperature element against harsh conditions and process fluid. It enables removal of the temperature element for replacement, repair, or testing without affecting the process system. Generally, thermowells are provided with all-temperature Elements like RTD or Thermocouple or temperature gauge. A few exceptions would be bearing RTD, skin type thermocouple, air duct thermometer, etc where thermowell is not applicable / required. When the thermowell assembly is inserted into the pipe, it is subjected to vibration. This vibration is caused by vortices to be generated alternately on either side of the thermowell. The...